![Landis+Gyr 3 SMETS2 User Manual Download Page 51](http://html1.mh-extra.com/html/landis-gyr/3-smets2/3-smets2_user-manual_673710051.webp)
Installation and Commissioning
Issue 1.2
51/143
D000058620 en a
– E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
© Gyr
13
Wait few
seconds
Meter may display ‘HAN
Join
Failed’ because
CBKE has not completed
within time limit (few
seconds). However,
CBKE process will
continue. Next step is to
check if this has actually
completed.
H A N J o i n F a i l e d
14
Wait few
seconds
Default Customer Menu
display is displayed
M a n a g e P I N ? A = N o
B = Y e s
15
Wait 30
seconds
The meter returns to the
Default Credit mode
display after 30 seconds.
R a t e X X A c t I m p
0 0 0 0 0
import
kWh
16
Retry HAN
Join
If the ‘HAN Join Failed’
Repeat steps 3 to 11 to
retry the join process
See Steps 3 to 11
16
Wait few
seconds
Wait a few seconds
without pressing any
buttons to return to the
Customer Menu ->
Manage PIN dialogue
M a n a g e P I N ? A = N o
B = Y e s
17
Wait 30
seconds
Wait for 30 seconds to
return to the default
Credit mode display .
R a t e X X A c t I m p
0 0 0 0 0
import
kWh
18
Meter Notifies
Supplier
Systems of
Successful
Join
When the meter joins the
HAN it notifies the
Supplier systems via an
I0 Response (Join
Success)
R a t e X X A c t I m p
0 0 0 0 0
import
kWh
19
Supplier Issues
Commissioning
Request
On receipt of successful
join response a
commissioning request is
triggered to the meter
R a t e X X A c t I m p
0 0 0 0 0
import
kWh
20
Synchronise
Clock with
Comms Hub
On successful processing
of the commissioning
request, the meter will
synchronise clocks with
the comms hub
R a t e X X A c t I m p
0 0 0 0 0
import
kWh
21
Meter Notifies
Supplier
Systems of
Successful
Commissioning
Request
When the meter
synchronises its clock
with the comms hub, it
will notify the Supplier
systems a success
response
R a t e X X A c t I m p
0 0 0 0 0
import
kWh