8.
An alternate method for starting the test would be to power the meter down and the
power the meter up. On power-up the meter will start the test. This method was provide
so a number of meters (gang testing) could start there test at the same time.
9.
When the test has been completed or stopped. The meter display will show “Test Mode
Complete”. And you can read the results from the meter display by scrolling the list using
the buttons on the face of the meter.
10.
You can run another test be pressing the demand reset.
a.
This will clear the old test data and the test will start.
11.
When you have completed your testing.
a.
Remove the testing equipment.
12.
Take the meter out of test mode by simultaneously press and hold the S1 Mode Select
button on the lower left side of the DPM (display card) and then press and hold the
demand reset button until the meter comes out of test mode. The meter cannot be running
a test when you try and exit test mode, always stop the test before exiting the test mode.
13.
Place the meter back into service.