Lanberg © 2015-2020
19
EN
3. Use 2 numbered vertical mounting rails
[M]
. Choose
a location to the left and right of the round holes on the
side frame.
4. Use a total of 4 M5*10 self-tapping screws
[B]
to attach the
vertical mounting rails to the side frame - 2 screws for each
end of the rail.
Remember to install the vertical
mounting rails so that:
I) Numbered side of the rails is
perpendicular to the square holes along the
side frame.
II) Rail numbering is increasing from left to right
(see the illustrations).
2
1
3
4
5
6
7
8
9
2
1
5. Place the 1st side frame aside, prepare the
2nd
one and install it where, the
previous side frame initially was.
6. Using the keys
[F]
, open the door lock of the 2nd side
frame
[K]
. Remove the side door and place where the
other one is. Reassembly will take place at the final
stage of the cabinet installation.
7. Rotate the side frame so that the outlet holes are facing
the ground.
Remember to position the side frame
with
M6
cage nuts attached, towards you.
8. Use 2 consecutive numbered vertical mounting rails
[M]
.
Choose exactly the same place (which you have chosen
previously) on the left and right of the round holes on the
side frame.
9. Use a total of 4 M5*10 self-tapping screws
[B]
to attach the
vertical mounting rails to the side frame - 2 screws for each
end of the rail.
2
1
3
4
5
6
7
8
9
2
1
The distance between the centers of the small holes (for vertical
mounting rails) on the side frames
[J + K]
is
20 mm
The maximum distance (working depth) between the front and rear
vertical mounting rails (taking into account their thickness) is:
I) For wall-mount cabinets with a total length of 450 mm:
261 mm
.
II) For wall-mount cabinets with a total length of 600 mm
411 mm
.
i