Visit our website at: www.lanair.com
13
Section 3 - Heater Installation
TYPICAL INSTALLATION:
HEATER/CHIMNEY PACKAGE
Tank-Mount Through-the-Roof
1.
Double-Wall Chimney Flue (Class A)
2.
Roof Penetration
3.
Single-Wall Chimney Flue
4.
Barometric Damper & Tee
5.
Tank-Mounted Heater Unit
6.
Burner
7.
Secondary Air Regulator
8.
Oil-Bypass Pressure Regulator
9.
Tank-Mount Support Legs
Chimney cap must be
at least 3 ft. taller than
any object within 10 ft.
Class “A” chimney
must be used for roof
penetration and any
exterior chiimney
Total chimney length
must be at least 10 ft.
for sufficient draft
10.
Primary
Strainer
11.
Fill Pipe (for priming)
12.
Fuel Pump
13.
Fuel-Pickup Assembly (in tank)
14.
Tank Drain
Compressed-air
supply,
electrical
shutoff
switch,
tank
vent,
and
additional
chimney
material
not
included.
Installation
configurations vary. Additional materials will be necessary.
Contact Lanair for Assistance with special circumstances.
1
2
3
4
5
6
8
9
10
11
7
12
13
14