24
Call 1-888-370-6531 for Technical Support
Nozzle Line Assembly – Top View Nozzle Line Assembly – Bottom View
Nozzle Line Assembly – Exploded View
10.
Reassemble in reverse order. See proper spacings on the following page. Make parts snug, but do
not overtighten. Replace any gaskets or o-rings that are damaged.
NOTE - The rubber/fiberglass insulation piece is required to prevent arcing between the electrode
and nozzle block. It is held in place by the electrode ceramic.
Flame
Retention
Head
Ignition
Electrode
Electrical
Insulation
Solenoid
Valve
Temp
Switches
Preheater
Gasket
Flat PTC
Heater
Oil Spray
Nozzle
FRH Set
Screw
Preheater
Extrusion
Air
Distribution
Plate
Cartridge
Heater
Summary of Contents for 81010751
Page 2: ......
Page 41: ...8 Appendices 8 1 Wiring Diagram ...
Page 42: ......
Page 43: ...34 Call 1 888 370 6531 for Technical Support 8 2 Primary Control Instructions ...
Page 44: ...35 Call 1 888 370 6531 for Technical Support Not used with RES 75 kBTU h units ...
Page 45: ...36 Call 1 888 370 6531 for Technical Support No latch up with RES 75 kBTU h units ...
Page 46: ...37 Call 1 888 370 6531 for Technical Support ...