background image

8

2   General Safety Instructions

2.5

Additional Components

The safety parameters do not include external components such as burner controls or any oth-

er sensors and actors.

2.6

Safety Values

The safety values have been determined by the use of a FMEDA with the following basic con-

ditions:

Component failure rates based on Siemens standard SN 29500, DIN EN 13611: 2011-12 

and B10d values of manufactures where no other values are available.

Specific load parameters, quality factors and an ambient temperature of 60 °C have been 

used for the calculation.

Failure models from DIN EN 13611 and additionally failure model drift have been used. 

Under special circumstances short circuits have not to be assumed.  

Estimation of common cause factors 

β

 = 2%  

β

D

 = 1%.

The "Proof test interval" T

1

 is equivalent to the product mission or life time.

The calculation of the safety probability values has been done with a lifetime of 10 years

1

.

For redundant structures a diagnostic test interval of T2 = 120s has been defined.

For redundant subsystems (HFT>=1) the SFF is > 90%, for subsystems without  

redundancy (HFT=0) the SFF is > 99%

The F200K is designed as one safety unit (PES). There is no separation within the  

F200K electronic between safety and non safety related components by architectural  

design.

There is no difference between 

λ

s

 detected and undetected. All safe failures can be  

assumed as safe undetected (

λ

su

).

1

 See chapter 

2.7 Life time

for more information.

Summary of Contents for F200K2 IR-1

Page 1: ...www lamtec de Sensors and Systems for Combustion Engineering Safety Manual F200K...

Page 2: ......

Page 3: ...fe State 7 2 4 Scope of Application 7 2 5 Additional Components 7 2 6 Safety Values 8 2 7 Life time 9 3 Installation and Commissioning 10 3 1 Verification 10 4 Operation 12 4 1 Proof Test 12 4 2 Proof...

Page 4: ...of the device The plant operator is responsible for the correct execution of these operations NOTICE The Safety Manual does not replace the operating and installation manuals of this device It contain...

Page 5: ...emperature range as defined in Appendix see chapter 7 2 Hints and require ments for installation commissioning operation and verification leads to a loss of the safety integrity and may cause personne...

Page 6: ...ttention to the possibility of imminent danger If it is not avoided it may result in death or very serious injury The plant including its surroundings could be damaged CAUTION This draws the user s at...

Page 7: ...robability of failures with no effect not used in SFF calculation HFT Hardware fault tolerance MooN M out of N channel architecture MTBF Mean time between failures MTTR Mean time to repair MTTF Mean t...

Page 8: ...pses in the event of modifications to the unit The unit s inputs and outputs must be wired according to the specifications in the instruction manual only DANGER The appendix Hints and requirements for...

Page 9: ...el drift have been used Under special circumstances short circuits have not to be assumed Estimation of common cause factors 2 D 1 The Proof test interval T1 is equivalent to the product mission or li...

Page 10: ...EN 61511 see 2 4 Scope of Application 3 SFF is relevant for elements subsystems or systems in a complete safety loop This device is always part of a com plete safety loop A SIL calculation of a safety...

Page 11: ...components remains still active DIN EN 61508 2 2011 Note N3 gives the hint that appropriate measures taken by the manufacturer and plant operator can extend the useful lifetime The burner control is d...

Page 12: ...he flame detector e g According to EN 61558 2 6 or EN 60950 1 WARNING Use a floating contact which is feeded by the flame detector s 24 V supply for the remote switching of the F200K2 s range Or use a...

Page 13: ...l for shutting off the safety valve is trig gered off within the period of TS 1 s on safety period Operation at tVOff 1 s after extinc tion of the flame Red LED lights Green LED dark For the IR compac...

Page 14: ...operation and decrease the average probability of dangerous failure on demand PFDAVG during the defined mission time According to DIN EN 61508 2011 6 the PFDAVG can be calculated by the use of a proof...

Page 15: ...d completely dangerous voltages can be applied at the cable contacts To execute a basic proof test with a PTC of 70 for the F200K series the following test steps must be executed and approved Disconne...

Page 16: ...ured while the device is being repaired or a maintenance is ongoing After a repair or a maintenance follow chapter 3 Installation and Commissioning again WARNING Replace the device only by one of the...

Page 17: ...uctions from the installation manual and ensure the safe operation of the application after that The device should be replaced after the product s mission or life time see chapter 2 7 Life time The de...

Page 18: ...17 7 Appendix 7 Appendix 7 1 T V Confirmation...

Page 19: ...18 7 Appendix...

Page 20: ...19 7 Appendix 7 2 Hints and requirements for installation commissioning operation and verification...

Page 21: ...20 8 EU Declaration of Conformity 8 EU Declaration of Conformity...

Page 22: ...21 8 EU Declaration of Conformity...

Page 23: ...22 8 EU Declaration of Conformity...

Page 24: ...KG Wiesenstra e 6 D 69190 Walldorf Telefon 49 0 6227 6052 0 Telefax 49 0 6227 6052 57 info lamtec de www lamtec de Publication no DLT7604 19 aEN 006 The information in this publication is subject to t...

Reviews: