71.38 inch Lat / Press Arm Cable
74
L
OW
P
ULL
/ L
EG
E
XTENSION
C
ABLE
R
OUTING
C
ABLE
R
OUTING
I
NSTRUCTION
Assembly Description:
Assembly Note
: The cable pulleys may have be removed and then reinstalled in order to route the cable assembly.
A)
Route the
Low Pull Cable Assembly
(#74) from the front of the
Leg Extension Arm
(#2) through the lower frame
pulleys, as shown.
B)
Continue routing the cable up and over the lower
Floating Pulley Assembly
.
C)
Pull the cable end down to the to the
Barrel Termination
(#31) positioned in the center of the frame. Thread cable
into the barrel, but do not tighten the jam nut until all final cable adjustments are done.
Summary of Contents for LS 70
Page 21: ......