71.38 inches Lat / Press Arm Cable
73
AB C
RUNCH
C
ABLE
R
OUTING
C
ABLE
R
OUTING
I
NSTRUCTION
Assembly Description:
A) Route the
AB Crunch Cable Assembly
(#73) through the front / middle section of the Vertical Upright (#4). Place
the cable over the 3.5 inch pulley and add the pulley stop hardware.
Note:
In most cases the installed pulleys most be
removed in order to route the cable assemblies.
B) Thread the end of cable into the barrel of the
(Single) Floating Pulley Assembly
(#14). Do not fully tighten the lock-
ing nut or make cable adjustments until all cable assemblies
have been properly routed.. (Reference Figure #1)
C) Loop the intermediate (floating) pulley assembly over the cable section (as shown) and tighten the pulley mounting
hardware. (Reference Figure #11)
D) Check the routing and make sure the cable is properly tracking in the V-groove of all the pulleys.
E) Add a
Snap Link
(#61) onto the front cable termination and attach the
Lat Bar
(#9). Rest the Lat Bar on top of the
bar holder and avoid letting it hang down during non-usage.
Pulley Stop Hardware
Summary of Contents for LS 70
Page 21: ......