HANDLING
10
HANDLING
LAGOON 42
The crane hook will be fitted with a gantry or a spreader system with
two slings.
The slings shall not be connected directly onto the hook, as it would
result in unusual compressive stresses on the hull.
- Crane lifting should be carried out slowly.
- Control the movement of the boat using mooring ropes.
n
10.3 Mast stepping - Mast unstepping
Mast stepping and mast unstepping shall be carried out by a specia-
list.
n
10.1 Preparation
The initial launching and the first tests of the different equipments
shall be carried out by your dealer so that you can expect to enjoy the
warranty in case of some equipment failure.
All further handling shall be carried out with the highest care by pro-
fessionals.
If the LAGOON boatyard are not involved in your handling operations,
they cannot cover under guarantee any possible accidents linked to
handling.
If later you have to launch your boat yourself, you should take the
following precautions:
- Retract the sensors under the hull into their housings (they may be
damaged by the handling slings).
- Check the water suction boxes for cleanliness.
- Turn off all the water inlet and drain valves (grey waters, black wa-
ters, engines).
- Check the anodes are in good condition and properly installed. An
anode shall never be painted.
n
10.2 Crane lifting
- Install a bow mooring rope, a stern mooring rope and fenders.
When using a crane to move the boat, check that slings cannot touch
any device (depth finder, speedometer, etc.) nor the propellers.
DANGER
Do not stay on board or under the boat during
craning.
Summary of Contents for 42
Page 1: ...User s guide...
Page 2: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 16: ......
Page 26: ...DAVIT SYSTEM 24 HULL DECK LAGOON 42 DAVIT SYSTEM TENDER...
Page 30: ......
Page 31: ...RIGGING SAILS 3 1 Sailing 3 2 Standing rigging 3 3 Running rigging 3 4 Sails 29 3...
Page 44: ......
Page 50: ......
Page 60: ......
Page 72: ......
Page 73: ...ELECTRICITY 7 1 12 V Circuit 7 2 Inverter 7 3 110 V 220 V Circuit 7 4 Electronics 71 7...
Page 86: ......
Page 87: ...MOTORIZATION 8 1 Engines 8 2 Fuel 8 3 Propellers Anodes 8 4 Dash board 85 8...
Page 90: ...FUEL WATER FILTER FUEL FILTER 88 MOTORIZATION LAGOON 42 WATER FILTER FUEL FILTER FUEL GAUGE...
Page 94: ......
Page 95: ...WINTER STORAGE 9 1 Laying up 9 2 Protection 93 9...
Page 96: ...DIMENSIONS FOR CRADLE POSITIONING 94 WINTER STORAGE LAGOON 42 2450 mm 8000 mm...
Page 98: ......
Page 99: ...HANDLING 10 1 Preparation 10 2 Crane lifting 10 3 Mast stepping Mast unstepping 97 10...
Page 100: ...2450 mm 8000 mm DIMENSIONS FOR CRANE LIFTING 98 HANDLING LAGOON 42...
Page 102: ......
Page 104: ...102 SAFETY LAGOON 42...
Page 114: ......
Page 115: ...MAINTENANCE 12 1 Maintenance schedule 113 12...
Page 118: ......
Page 120: ......
Page 121: ......
Page 122: ......