HULL / DECK
25
2
HULL / DECK
l
LAUNCHING A TENDER FROM THE DAVIT
Put the water drain plug back into position in the tender.
- Check that the jammer located on the davit is locked.
- Pass the davit line around the winch (make at least three turns).
After having removed the hold safety devices and moored the tender:
- Open the blocker and let the line run until the tender reaches the
water.
- Cast off the tackle hooks on the davit to the fore and aft of the
tender.
- Remount and secure the davit system.
When sailing, remove the tender engine and store it on board.
Moor the tender considering the sea state and the route.
Put in the tender the security equipment in conformity with the
registration country of the boat.
n
2.9 Davit system (optional extra)
The boat can be fitted with a davit system with manual winch (code 0
or genoa furling winch) as an option.
l
INSTALLING A TENDER ONTO THE DAVIT
After having taken away everything from the tender:
- Lower the davit system as close as possible to the tender.
- Fix the tackle hooks located on the davits to the fore and aft of the
tender.
- Close the blocker located on the port side of the davit system.
- Remount the davit and tender using the electric manoeuvring
winch.
- Once in the top position, secure the davit system and tender using
the appropriate ropes.
- Remove the water drain plug from the tender.
LAGOON 42
WARNING
The davit system is designed to support a maximum
load of 250 kg and a tender which is maximum 3,50
metres long.
WARNING
Nobody should be on board or under the tender
during manoeuvres carried out with the davit.
Tie up the tender during manoeuvres.
Summary of Contents for 42
Page 1: ...User s guide...
Page 2: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 16: ......
Page 26: ...DAVIT SYSTEM 24 HULL DECK LAGOON 42 DAVIT SYSTEM TENDER...
Page 30: ......
Page 31: ...RIGGING SAILS 3 1 Sailing 3 2 Standing rigging 3 3 Running rigging 3 4 Sails 29 3...
Page 44: ......
Page 50: ......
Page 60: ......
Page 72: ......
Page 73: ...ELECTRICITY 7 1 12 V Circuit 7 2 Inverter 7 3 110 V 220 V Circuit 7 4 Electronics 71 7...
Page 86: ......
Page 87: ...MOTORIZATION 8 1 Engines 8 2 Fuel 8 3 Propellers Anodes 8 4 Dash board 85 8...
Page 90: ...FUEL WATER FILTER FUEL FILTER 88 MOTORIZATION LAGOON 42 WATER FILTER FUEL FILTER FUEL GAUGE...
Page 94: ......
Page 95: ...WINTER STORAGE 9 1 Laying up 9 2 Protection 93 9...
Page 96: ...DIMENSIONS FOR CRADLE POSITIONING 94 WINTER STORAGE LAGOON 42 2450 mm 8000 mm...
Page 98: ......
Page 99: ...HANDLING 10 1 Preparation 10 2 Crane lifting 10 3 Mast stepping Mast unstepping 97 10...
Page 100: ...2450 mm 8000 mm DIMENSIONS FOR CRANE LIFTING 98 HANDLING LAGOON 42...
Page 102: ......
Page 104: ...102 SAFETY LAGOON 42...
Page 114: ......
Page 115: ...MAINTENANCE 12 1 Maintenance schedule 113 12...
Page 118: ......
Page 120: ......
Page 121: ......
Page 122: ......