These chapters in the manual are to be used by qualified, authorized technical staff.
WATER CONNECTIONS
No leaks from the connections or tubes
•
FUNCTIONING
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-leveling device is working properly.
•
The expansion valves are working properly
•
5. Installation Check-up
WARNING
: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
COFFEE CIRCUIT / MILK CIRCUIT / SOLUBLES CIRCUIT
Press the
•
PRG
(
29
)
key and then the icon
;
choose the type of wash cycle, and follow the instructions on the touch
screen.
HOT WATER
Continuously dispense hot water
•
until at least 0.5 liters of water have been dispensed.
WARNING
: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING TO THE
INSTRUCTIONS BELOW:
54
English