6.
Commissioning
1 Display
2 Reset and test button
3 Type plate with the
serial number
Figure 12. User interface description
Most of the idOil Solar parameters are already initialized at the factory. Factory settings are
described in
APPENDIX; Factory settings for idOil Solar
.
idOil Solar must be activated in order to commission the system. This is done by pushing
the
Test and reset
button of idOil-30 Control Unit for 10 seconds.
Power
switch must be
ON.
6.1. Simple commissioning
Ensure that the sensors have been installed and connected in the control unit in
accordance with the instructions in the previous paragraphs.
Connect power to the control unit.
A message is shown in the control unit
display:
NO SENSORS.
Figure 13. Initial start-up
Open the cover of the control unit.
Briefly press the sensor identification
button (1).
Figure 14. Sensor identification button.
Installation and Operating Instructions | idOil Solar
19/58
DOC001599-EN-3