11
C
C
H
H
A
A
P
P
T
T
E
E
R
R
3
3
G
G
E
E
T
T
T
T
I
I
N
N
G
G
S
S
T
T
A
A
R
R
T
T
E
E
D
D
Now that the site for your filtered enclosure is properly prepared,
you are ready to unpack, inspect, install, and validate your system.
Read this chapter to learn how to:
•
Unpack and move the enclosure.
•
Set up the enclosure with the proper supporting structure
and work surface.
•
Connect to an exhaust system if applicable.
•
Installation of HEPA and accessory Odor Control carbon
filters.
•
Connect the electrical supply.
•
Set the face velocity with the speed control adjustment.
•
Arrange validation for the enclosure.
•
Seal the enclosure to the work surface.
Depending upon which model you are installing, you may need
common mechanical and electrical installation tools in addition to
5/16", 3/8", 7/16", and 1/2" wrenches, ratchets, sockets, a nut
driver set, a flat-blade screwdriver, a Phillips screwdriver, and a
carpenter level to complete the instructions in the chapter.
Each enclosure model weighs between 125 to 195
lbs. each (55 to 85 kg). The shipping container
allows for lifting with a mechanical lift truck or
floor jack. If you must lift the enclosure
manually, follow safe-lifting guidelines.
Do not
lift by the front air foil
.
!
Summary of Contents for 3940200
Page 2: ......
Page 19: ...14 Chapter 3 Getting Started Figure 3 1 Filtered Enclosure Installation...
Page 73: ...68 Chapter 7 Accessorizing and Modifying your Filtered Enclosure...
Page 85: ...80 Appendix B Dimensions and Exhaust Options Figure B 1 XPert Filtered Balance System...
Page 86: ...81 Appendix B Dimensions and Exhaust Options Figure B 2 XPert Filtered Balance Station...
Page 90: ...85 Appendix C Filtered Enclosure Specifications C 1...
Page 91: ...86 Appendix C Filtered Enclosure Specifications C 2...
Page 92: ...87 Appendix C Filtered Enclosure Specifications C 3...
Page 93: ...88 Appendix C Filtered Enclosure Specifications C 4...
Page 100: ...95...
Page 101: ......