5
C
C
H
H
A
A
P
P
T
T
E
E
R
R
2
2
P
P
R
R
E
E
R
R
E
E
Q
Q
U
U
I
I
S
S
I
I
T
T
E
E
S
S
Before you install the filtered enclosure, you need to prepare your
site for installation. You must be certain that the area is level and
of solid construction. In addition, a dedicated source of electrical
power should be located near the installation site to power the
filtered enclosure, balance and other apparatus. Additionally, the
enclosure should be strategically placed in the lab to provide
efficient workflow.
Carefully read this chapter to learn the requirements for your
installation site:
•
The support, vibration and movement requirements.
•
The temperature variation requirements.
•
The humidity and static electricity requirements.
•
The location and air current requirements.
•
The exhaust and blower requirements.
•
The electrical power requirements.
•
The space requirements.
Refer to
Appendix B: XPert
Dimensions
for complete enclosure
dimensions.
Refer to
Appendix C: XPert Specifications
for complete filtered
enclosure electrical and environmental conditions, specifications
and requirements.
Summary of Contents for 3940200
Page 2: ......
Page 19: ...14 Chapter 3 Getting Started Figure 3 1 Filtered Enclosure Installation...
Page 73: ...68 Chapter 7 Accessorizing and Modifying your Filtered Enclosure...
Page 85: ...80 Appendix B Dimensions and Exhaust Options Figure B 1 XPert Filtered Balance System...
Page 86: ...81 Appendix B Dimensions and Exhaust Options Figure B 2 XPert Filtered Balance Station...
Page 90: ...85 Appendix C Filtered Enclosure Specifications C 1...
Page 91: ...86 Appendix C Filtered Enclosure Specifications C 2...
Page 92: ...87 Appendix C Filtered Enclosure Specifications C 3...
Page 93: ...88 Appendix C Filtered Enclosure Specifications C 4...
Page 100: ...95...
Page 101: ......