manualshive.com logo in svg
background image

Rinnai 

SMART BOX IM

Smart Box® Installation Instructions

For Recess Enclosure SBOXI / SBOXC & Semi- Recess Frame SBOXF

To suit Rinnai REU water heater models: 1220 | 1620 | 2024 | 2426 | 2626 | 2630

Take care to AVOID exposing Smartbox 

components to ANY EXCESSIVE HEAT when 

welding pipes.

The Smart Box® (SBOX) Recess Enclosure 

system  is made up of two (2) components 

these are the SBOXI (insert) and SBOXC 

(cover). These are packed together in the one 

carton.

If you DO NOT have a SBOXC (cover) for your 

Smart Box contact your supplier.

SBOXC

SBOXI

Cover

Clip

Slot

Cover

Clip

Slot

Cover

Clip

Slot

Cover

Clip

Slot

Pipe

Access

Slot

Support

Bracket

Slot

DO NOT

Obstruct the slots provided for the Cover Clips, Support Bracket or Pipe Access

A

Securing the Smart 

Box Insert externally

Securing the Smart 

Box Insert internally 

through the side wall

Securing the Smart 

Box Insert internally 

through the rear wall

Securing the Smart 

Box Insert with the use 

of brick ties

Securing Method

B

Securing Method

C

Securing Method

D

Securing Method

Содержание Smart Box SBOXI

Страница 1: ...acked together in the one carton If you DO NOT have a SBOXC cover for your Smart Box contact your supplier SBOXC SBOXI Cover Clip Slot Cover Clip Slot Cover Clip Slot Cover Clip Slot Pipe Access Slot Support Bracket Slot DO NOT Obstruct the slots provided for the Cover Clips Support Bracket or Pipe Access A Securing the Smart Box Insert externally Securing the Smart Box Insert internally through t...

Страница 2: ...ng the Smart Box Insert externally Secure to the wall surface via the 8 screw holes provided in the flange of the Insert using suitable fasteners B Securing the Smart Box Insert internally through the side wall Secure the Insert into a solid fixture such as brickwork timber studs etc through the side walls using suitable fasteners At least two fasteners should be used through each side wall approx...

Страница 3: ...pliance MUST BE copied to the sticker on the inside of the Smart Box Cover The serial and model numbers are required for future service work 3 sert the upper mounting bracket 5 of the Rinnai water heater into the bracket slot 6 located at the top of the Insert Push the appliance up until the lower mounting bracket 7 aligns with the fixing studs 4 and secure in place with the two M5 Nyloc nuts 3 re...

Страница 4: ...e IMPORTANT When securing the SBOXI Insert and SBOXF Frame from the front use ONLY the 8 screw holes 3 that are provided DO NOT attempt to screw or nail through the sealing flange of the SBOXF Frame as this may damage the Frame B Securing SBOXI SBOXF internally through the side wall Secure the SBOXI insert into a solid fixture such as brickwork timber studs etc through the side walls using suitabl...

Отзывы: