36
Installation Instructions
Everhot Vertical Discharge Vent System
Figure 37
Identify the vent location
Determine the location where the roof discharge terminal will be installed. Taking into account the angle
of the roof, cut the hole with a dimension that allows the vertical discharge roof terminal to be installed.
Cut to fit
Figure 38
The terminal can be shortened by
removing the components A+B+C,
and then shortening both the inside
and outside pipes with the same
length X.
Re-assemble the terminal by attaching
the components A, B, and C in the
correct order. Tighten component B
securely.
Summary of Contents for IGI-180R-10N
Page 7: ...7 EVERHOT IGI Model Series Dimensions Figure 1...
Page 14: ...14 Recommended Piping for a Basic Installation Figure 2...
Page 15: ...15 Recommended Piping for a Circulation System Figure 3...
Page 35: ...35 Horizontal Vent System Installation examples Figure 36...
Page 38: ...38 Vertical Vent System Installation examples Figure 40...
Page 39: ...39 Cut Line Template Figure 41...
Page 44: ...44 Wiring Diagram Schematic Figure 43...
Page 59: ...59 Schematic Diagram of Internal Parts Figure 53...
Page 61: ...61 Internal Components...
Page 62: ...62 Internal Components...
Page 63: ...63 Electrical Components...
Page 67: ...67 NOTES...