4. Machine Operation and Coffee Preparation

Once installation has been completed, you 

can proceed to hook up the filter holders 

(Fig.  5)  called  portafilters,  together  with 

their filters, to the bottom of the groups 

by rotating them from left to right. Before 

operating  the  various  switches  and  thus 

powering up the heater elements, fill up 

the boiler tanks with water, as follows:

1. COFFEE BOILER

The  water  flows  inside  the  coffee  boiler

directly,  as  soon  as  the  water  system

and  purifier  taps  are  opened.    Since  the

inflowing  water  will  compress  the  air  in 

the boiler it will be necessary, in order to 

completely  “saturate”  the  boiler-groups 

assembly,  to  remove  the  group  cover 

plate  (part  20  Fig.  4)  and  unscrew  the 

small  bolt  (part  21)  called  bleed  screws 

a  little  way  so  as  to  allow  air  to  escape 

until  a  few  drops  of  water  leak  out  (see 

diagram below). This should be repeated 

for  each  group,  then  tighten  the  bleed 

screws again and reinstall the cover.

Connect the other end to a suitable waste 

water collection system. 

In case such a system is not available, and if 

acceptable according to local regulations, 

drained  liquids  may  be  collected  in  a 

suitable  bucket  and  any  necessary  drain 

pipe extensions shall be made using steel-

lined PVC tubing and suitable hose clamps.

fig. 5 - Portafilter (see also part. 4, fig. 1 or 3)

Saturation of group via “bleed screw”

Summary of Contents for Linea

Page 1: ...ne the industry The Linea is the classic La Marzocco machine that has long supported and helped to develop the specialty coffee industry since the 1990s It is a heavy duty workhorse that performs reli...

Page 2: ...39 055 849 1990 page 2 page 4 page 7 page 11 page 16 page 18 page 19 page 21 page 22 1 General Warnings and Safety Specifications 2 Definition of Available Models 3 Installation 4 Machine Operation a...

Page 3: ...nit very carefully Make sure grounding has been done correctly as it represents a fundamental safety requirement and in case of doubt do not hesitate to have qualified personnel check such connection...

Page 4: ...the cup warmer tray with cloths or other items 13 The machine s power supply cable must not be replaced by users as also specified on the rating plate located near the outlet of such cable on the bod...

Page 5: ...ig 2 Front panel of PADDLE model available with 1 2 3 and 4 groups 1 Main Switch 2 Water level sight glass 3 Pressure gauge 4 Coffee groups 5 Coffee brewing control switch 6 Cup warmer switch non UL m...

Page 6: ...3groups 5 0litres 1600or1900Watts 4groups 3 4 3 4litres 1400 1400Watts 2boilersinstalled It consists of a cylindrical tank of varying length according to the number of coffee groups which is made of s...

Page 7: ...quantity of water for one normal espresso coffee a quantity of water for one tall coffee a quantity of water for two normal coffees a quantity of water for two tall coffees The fifth button is used t...

Page 8: ...nsion valve 20 Group cover 21 Bleed screw 22 PID Temperature Controller 23 Switch not provided 24 Plug not provided 25 Connectors Fig 4 THE COFFEE MACHINE MUST BE PLACED IN A HORIZONTAL POSITION ON A...

Page 9: ...ould be placed on a flat counter and must be placed in settings with the following temperatures Minimum room temperature 5 C 41 F Maximum room temperature 32 C 89 F If the machine has been temporarily...

Page 10: ...ter pump motor power cord This is the power supply for the water pump motor The internal electronics will switch the pump motor on when needed 3 core cable with 1 5 mm2 cross section or 3 core AWG 16...

Page 11: ...l be necessary in order to completely saturate the boiler groups assembly to remove the group cover plate part 20 Fig 4 and unscrew the small bolt part 21 called bleed screws a little way so as to all...

Page 12: ...he first installation procedures are finished before proceeding with brewing coffee hot water and steam please follow these steps Engage the portafilters by inserting them into each group brew water t...

Page 13: ...d valve diffuser diffuser coffee brewing spout The wheel is designed in such a way as to rotate freely when water is flowing by it sends 2 signals every complete rotation to the electronic module whic...

Page 14: ...ater flow within the factory set time of the electronic module 2 insufficient water flow through the groups i e onto the coffee powder probably due to a combination of one or more of the following occ...

Page 15: ...ting elements in order to bring the water contained in such boiler up to operating temperature However in this case it is necessary to adjust the expansion valve marked 19A in fig 4 in such a way that...

Page 16: ...value or SV setting value When set ting a parameter its name or its value appears 3 SEL key Used to switch the PV display to from the SV display and select a parameter block and a parameter and regis...

Page 17: ...e press to decrease the value by 1 Press and hold this key to decrease to desired value then wait a few seconds to automatically exit programming function For more detailed information on the potentia...

Page 18: ...u will end up with a fresh cappuccino In order to prevent part of the liquid to be heated from being sucked back into the boiler due to a possible temporary decompression inside the boiler tank which...

Page 19: ...drain collector Remove the drain tray grill every night pull out the water drain collector and clean it thoroughly Also inspect and clean the drain well part 19 at least twice a week and remove any l...

Page 20: ...lve part 19A should start working by discharging a few drops of water in order to prevent such pressure from exceeding 12 bar If the pressure exceeds 12 bar you must adjust the valve by unscrewing the...

Page 21: ...sed in advance Proceed to remove the drain well piping part 19 At this point the machine may be removed from the bar being very careful not to drop it The machine is made out of various mate rials and...

Page 22: ...tallation otherwise warranty is voided If AV Model Check shot volumes Test flowmeter s ohm value ohm value is acceptable if greater than 1 8 K ohm and less than 2 2 K ohm If MP Model Rebuild MP valve...

Page 23: ...EN...