background image

12

EN

group  from  right  to  left  (part  1)    thus 

allowing coffee to be brewed; when you 

have  obtained  your  desired  amount  of 

coffee, return the paddle handle back to 

original  position  on  the  right-hand  side, 

at  which  point  the  machine  discharges 

the pressure built up in the portafilter. It 

may  then  be  removed  to  proceed  with 

making  another  coffee,  as  required.    In 

order to pre-infuse the coffee in the filter, 

once the portafilter has been engaged in 

the group, move the paddle handle only 

half  way  from  the  right  to  left  for  a  few 

seconds, then move all the way to the left 

in order to brew your espresso/s, until the 

desired dose is released in the cup, then 

turn off by returning the paddle handle to 

its original position on the right-hand side.

For AV model - fig. 3

It  is  essential  to  program  the  quantity 

of  water  delivered  by  performing  the 

following operations with the utmost care. 

In  case  of  doubt  or  difficulties,  please 

contact our technical service.

Introduction

The  coffee  metering  system  is  based 

on  the  amount  of  water  which  will  be 

delivered onto the ground coffee, already 

set in the filter and the portafilter, which 

is  measured  through  a  water  volume 

control  system,  which  is  located  above 

the  group  assembly  flange,  where  the 

group connects to the boiler. Inside each 

counter  there  is  a  paddle  wheel  (which 

we  shall  call  wheel  for  simplicity)  which 

rotates as water flows by.

The  sequence  of  the  water  cycle  is  as 

follows:

group  

- counter

counter  

- solenoid valve

solenoid valve  - diffuser

diffuser 

- coffee brewing spout

The wheel is designed in such a way as to 

rotate freely when water is flowing by; it 

sends 2 signals, every complete rotation, 

to the electronic module which processes 

them  and  activates  the  solenoid  valve 

relay of the corresponding group, as well 

as the motor pump relay.

Such  electronic  module  also  processes 

the signal sent by the boiler’s level gauge 

and  consequently  activates  the  relative 

solenoid  valve  relay  of  the  same  motor 

pump.

Procedure for programming doses - fig. 3 

Programming for the 3D/5 version

Press and hold the button with the spiral 

symbol  for more than 4 seconds. 

You can then follow the same operations 

as  for  the  standard  version,  which  are 

described in the following.

The  LEDs  stay  on  for  5  seconds  after 

which,  if  no  button  has  been  pressed, 

they  turn  off;  you  must  then  repeat  the 

above-mentioned procedure to turn them 

on  again  and  to  prepare  the  electronic 

module for programming;

1. Press the first button within 5 seconds

and press it again once you have obtained

the  desired  amount  of  coffee;  at  this

point,  the  LEDs  will  turn  off  and  this

button will remain programmed as for the

dose brewed previously;

2. Repeat steps for the other three buttons;

any time a button has been programmed,

by  pressing  the  button  with  the  spiral

again,  the  LED  of  the  programmed

button(s) will remain switched off.

3. Once you have programmed the first 4

buttons of the first control panel from the

left, the dosage programs set according to

the above will be stored in memory and

the  5th  button  (the  one  with  the  spiral)

will return to its function as a continuous

brewing on/off button.

COFFEE BREWING CONTROL PANEL (part. 5 fig 3)

Summary of Contents for Linea

Page 1: ...ne the industry The Linea is the classic La Marzocco machine that has long supported and helped to develop the specialty coffee industry since the 1990s It is a heavy duty workhorse that performs reli...

Page 2: ...39 055 849 1990 page 2 page 4 page 7 page 11 page 16 page 18 page 19 page 21 page 22 1 General Warnings and Safety Specifications 2 Definition of Available Models 3 Installation 4 Machine Operation a...

Page 3: ...nit very carefully Make sure grounding has been done correctly as it represents a fundamental safety requirement and in case of doubt do not hesitate to have qualified personnel check such connection...

Page 4: ...the cup warmer tray with cloths or other items 13 The machine s power supply cable must not be replaced by users as also specified on the rating plate located near the outlet of such cable on the bod...

Page 5: ...ig 2 Front panel of PADDLE model available with 1 2 3 and 4 groups 1 Main Switch 2 Water level sight glass 3 Pressure gauge 4 Coffee groups 5 Coffee brewing control switch 6 Cup warmer switch non UL m...

Page 6: ...3groups 5 0litres 1600or1900Watts 4groups 3 4 3 4litres 1400 1400Watts 2boilersinstalled It consists of a cylindrical tank of varying length according to the number of coffee groups which is made of s...

Page 7: ...quantity of water for one normal espresso coffee a quantity of water for one tall coffee a quantity of water for two normal coffees a quantity of water for two tall coffees The fifth button is used t...

Page 8: ...nsion valve 20 Group cover 21 Bleed screw 22 PID Temperature Controller 23 Switch not provided 24 Plug not provided 25 Connectors Fig 4 THE COFFEE MACHINE MUST BE PLACED IN A HORIZONTAL POSITION ON A...

Page 9: ...ould be placed on a flat counter and must be placed in settings with the following temperatures Minimum room temperature 5 C 41 F Maximum room temperature 32 C 89 F If the machine has been temporarily...

Page 10: ...ter pump motor power cord This is the power supply for the water pump motor The internal electronics will switch the pump motor on when needed 3 core cable with 1 5 mm2 cross section or 3 core AWG 16...

Page 11: ...l be necessary in order to completely saturate the boiler groups assembly to remove the group cover plate part 20 Fig 4 and unscrew the small bolt part 21 called bleed screws a little way so as to all...

Page 12: ...he first installation procedures are finished before proceeding with brewing coffee hot water and steam please follow these steps Engage the portafilters by inserting them into each group brew water t...

Page 13: ...d valve diffuser diffuser coffee brewing spout The wheel is designed in such a way as to rotate freely when water is flowing by it sends 2 signals every complete rotation to the electronic module whic...

Page 14: ...ater flow within the factory set time of the electronic module 2 insufficient water flow through the groups i e onto the coffee powder probably due to a combination of one or more of the following occ...

Page 15: ...ting elements in order to bring the water contained in such boiler up to operating temperature However in this case it is necessary to adjust the expansion valve marked 19A in fig 4 in such a way that...

Page 16: ...value or SV setting value When set ting a parameter its name or its value appears 3 SEL key Used to switch the PV display to from the SV display and select a parameter block and a parameter and regis...

Page 17: ...e press to decrease the value by 1 Press and hold this key to decrease to desired value then wait a few seconds to automatically exit programming function For more detailed information on the potentia...

Page 18: ...u will end up with a fresh cappuccino In order to prevent part of the liquid to be heated from being sucked back into the boiler due to a possible temporary decompression inside the boiler tank which...

Page 19: ...drain collector Remove the drain tray grill every night pull out the water drain collector and clean it thoroughly Also inspect and clean the drain well part 19 at least twice a week and remove any l...

Page 20: ...lve part 19A should start working by discharging a few drops of water in order to prevent such pressure from exceeding 12 bar If the pressure exceeds 12 bar you must adjust the valve by unscrewing the...

Page 21: ...sed in advance Proceed to remove the drain well piping part 19 At this point the machine may be removed from the bar being very careful not to drop it The machine is made out of various mate rials and...

Page 22: ...tallation otherwise warranty is voided If AV Model Check shot volumes Test flowmeter s ohm value ohm value is acceptable if greater than 1 8 K ohm and less than 2 2 K ohm If MP Model Rebuild MP valve...

Page 23: ...EN...

Reviews: