
EN
110
Display
Operating Procedure
Description
“Technical” Programming
Solenoid Test
Settings
• This parameter allows the technician
to verify the proper work of all solenoid
valves.
Solenoid Test
Enter Password
******
1
After accessing the “Technical” programming menu and entering the password, use the buttons
T1 and T2
until the following screen is displayed.
Solenoid Test
Settings
2
Press the T3 button to enter the menu.
Test Group G1
Solenoid
Testing
Solenoid ...
3
Press the T3 button to start verifying the proper work of coffee group solenoid valve.
Power:12.00W
Opened: YES
Peak: 9.20W
Trough: 7.50W
4
These values indicate the proper work of coffee group solenoid valve.
Enter Password
******