TM00358 Rev. A
Chapter 4 - Turret Aircraft Installation
L-3 WESCAM
October 2007
All Rights Reserved
75
4.3
TURRET AIRCRAFT INSTALLATION
Installation of the turret into an aircraft requires three separate steps:
•
Step 1 – Inspection for corrosion
•
Step 2 – Surface sealant application
•
Step 3 – Installation and mechanical fasteners
Table 4-2 Turret Installation — Parts
Description
Part Number
Quantity
Notes
Turret
42390
1
Turret shipping case
41179
1
1/4”-28 x ( ~” ) Cap screw,
socket headed
–
8
• Installation screws are
Customer Furnished
Equipment that must
conform to NAS 1351-4
• Screw length is installation
specific.
• Make sure screw length
extends 1 cm (3/8”) below
the mating surface.
• Torque screws to
100
±
10 in-lbs
(11 Nm
±
1.1 Nm)
Table 4-3 Turret Installation — Consumables
Description
Part Number
Manufacturer
Notes
Joint compound, non-
chromate corrosion inhibitive
CA 1000
PRC-DeSoto International
• Consult manufacturer’s
Technical Data Sheet for
use instructions and
MSDS for material
handling safety.
New, lint-free cloths that
conform to AMS 3819
–
Numerous
• Consult a CA 1000
technical data sheet for
surface preparation
guidance.
• Use one cloth to clean and
another cloth to wipe.
Isopropyl Alcohol
–
–
• Remove dirt, grease, and
lubricants prior to
compound application.