Connection to LA amplied controllers
5.
Secure the connector sealing plate to the connector plate.
T25
3 N.m
6.
Tighten the sealing nut.
What to do next
To remove the cables, use the small tool to unlock the terminals and pull on the wires.
Kara IIi owner's manual (EN) version 2.0
103