Rigging procedures
2.
Secure KARAIIi-RIGBAR at the rear of the enclosure with M6×40 Torx rigging screws.
Secure KARAIIi-RIGBAR at the front for a positive initial site angle.
Tighten the screws with a 5 N.m. torque.
T30
5 N.m
T30
5 N.m
3.
Secure a shackle or CLAMP250 to KARAIIi-RIGBAR and raise the array.
Maximum limit with CLAMP250.
CLAMP250 has a WLL (Working Load Limit) of 250 kg / 550 lb. It can support an array of up to 11 Kara IIi
or 5 SB18 IIi. For an hybrid array, check the total weight of the array in Soundvision.
For more information, refer to the
CLAMP250 owner's manual
.
4.
To complete the array, follow the procedure in
Flying an array with KARAIIi-BUMP
(p.50).
What to do next
•
Adding a pullback with KARAIIi-RIGBAR
(p.65)
•
(p.94)
64
Kara IIi owner's manual (EN) version 2.0