
Rigging procedures
2.
Secure KARAIIi-BUMP on top of a rst SB18 IIi.
Optionally, secure M-BARi on KARAIIi-BUMP to extend the site angle capability.
Use the provided rigging axes, nuts, and safety pins.
Tighten all the screws on KARAIIi-BUMP. Apply a torque of 5 N.m.
T30
10 mm
5 N.m
3.
Select the pickup point and raise the array.
FRONT
A B
A B
1 2
4
3
5 6 7 8 9
KARAIIi-BUMP pickup points
1
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0
M-BARi pickup points
4.
Secure a second SB18 IIi under the array.
a) Place SB18 IIi (equipped with SB18IIi-LINK) under the array.
56
Kara IIi owner's manual (EN) version 2.0