2PX/2PY
1-5-20
5. Check or replace the developing unit
and refit all the removed parts.
NOTE:
*: Remove the cap before installing the new
developing unit.
*: When reinstalling the developing unit,
press it down until the lever of developing
unit is engaged with the notch.
*: If it is difficult to engage the lever, press
the unit down while rotating the gear to
engage it.
Figure 1-5-29
Lever
Lever
Gear
Notch
Developing unit
New
developing
unit
Cap
Notch
Summary of Contents for 6026
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 134: ...2PX 2PY 1 3 96 This page is intentionally left blank ...
Page 237: ...2PX 2PY 1 5 51 9 Remove the scanner unit Figure 1 5 78 Scanner unit ...
Page 275: ...2PX 2PY 1 5 89 4 Remove the paper conveying unit Figure 1 5 145 Paper conveying unit 1 2 2 ...
Page 280: ...2PX 2PY 1 5 94 This page is intentionally left blank ...
Page 323: ...2PX 2PY 2 2 10 This page is intentionally left blank ...
Page 371: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR Card Authentication Kit D ...
Page 372: ...1 2 3 4 5 a a c CARD READER CARD READER HOLDER D b ...
Page 373: ...10 b c 6 8 9 7 ...
Page 375: ......