3. INSPECTION/ADJUSTMENT
3-11
G-DINK 300i
NUTS/BOLTS/FASTENERS
Check all important chassis nuts and bolts for
looseness.
Tighten them to their specified torque values
if any looseness is found.
WHEELS/TIRES
Check the tires for cuts, imbedded nails or
other damages.
Check the tire pressure.
Tire Pressure
1 Rider
1 Rider (with
passenger)
Front
1.75 kg/cm
²
1.75
kg/cm
²
Rear
2.0 kg/cm
²
2.25
kg/cm
²
Tire Size:
Front
120/70-14
Rear
10/70-13
Check the front axle nut for looseness.
Check the rear axle nut for looseness.
If the axle nuts are loose, tighten them to the
specified torques.
Torque:
Front axle nut 2 kg-m
Rear axle nut 12 kg-m
STEERING HANDLEBAR
Raise the front wheel off the ground and
check that the steering handlebar rotates
freely.
If the handlebar moves unevenly, binds, or
has vertical movement, adjust the steering
head bearing.
•
Tire pressure should be checked when
tires are cold.
*
Front Axle Nut
Rear Axle Nut
Summary of Contents for G-DINK 300i
Page 4: ...1 GENERAL INFORMATION 1 1 G DINK 300i Identification Numbers Record ...
Page 11: ...1 GENERAL INFORMATION 1 8 G DINK 300i TORQUE VALUES ...
Page 12: ...1 GENERAL INFORMATION 1 9 G DINK 300i TORQUE VALUES ...
Page 13: ...1 GENERAL INFORMATION 1 10 G DINK 300i TORQUE VALUES FRAME ...
Page 43: ...3 INSPECTION ADJUSTMENT 3 2 G DINK 300i MAINTENANCE SCHEDULE ...
Page 55: ...4 LUBRICATION SYSTEM 4 1 G DINK 300i LUBRICATION ...
Page 72: ...6 CYLINDER HEAD VALVES 9 1 G Dink 300i 6 1 ...
Page 89: ...7 CYLINDER PISTON 10 1 G Dink 300i SCHEMATIC DRAWING 7 1 ...
Page 114: ...9 FINAL REDUCTION 9 1 G DINK 300i SCHEMATIC DRAWING ...
Page 123: ...10 A C GENERATOR STARTER CLUTCH 10 1 G Dink300i SCHEMATIC DRAWING ...
Page 130: ...11 CRANKCASE CRANKSHAFT 11 1 G DINK 300i SCHEMATIC DRAWING ...
Page 138: ...12 COOLING SYSTEM 12 1 G DINK 300i SCHEMATIC DRAWING ...
Page 210: ...15 REAR BRAKE REAR FORK REAR WHEEL REAR SHOCK ABSORBER 15 1 G DINK 300i SCHEMATIC DRAWING ...
Page 217: ...15 REAR WHEEL REAR BRAKE REAR SUSPENSION G DINK 300i 15 8 ...