
K U N S T S T O F F – V E R B I N D U N G S – T E C H N I K G M B H
Stand: Okt-12
Werkering 6 – 33609 Bielefeld – Tel. 0521 / 93207-0 – Fax 0521 / 93207-11
Kap. 7 – Seite 13
7.6
Commissioning EWS components
Note: All technical equipment must be at room temperature before
commissioning.
7.6.1
Make connections
1.
Connect generator and compensator with the supplied EWS connec-
tion cable.
1.
Generator connection [sockets]
2.
Compensator connection [pins]
3.
Green flow rate control LED
Photo14: ERW connection cable
2.
Screw the EWS compensation to the electromagnetic converter using a
pair of EWS tubed cables or copper pipe. All connections must be
made with an electrically conductive material (brass, copper).
Converter connection
Thread: G1/8
1.
Copper sealing
ring
Photo 15: EWS tubed cable – converter side -
Compensator connection
Ferrule fitting Ø 10 mm
1.
Cutting ring
2.
Union nut
Photo 16: EWS tubed cable – compensator side -
The standard EWS connection
cable is 1.5 m long. Special
lengths up to a maximum of 4 m
are available on request.