2-1
CHAPTER 2
Maintenance of ON-3V
This chapter describes preventative maintenance steps for
KVAL ON-3V System
.
The content is
geared to guide technicians to keep a regular maintenance schedule for your KVAL machine.
Keeping your KVAL machine maintained is an important piece for successful operation of your
door production process.
Chapter 2 at a Glance
Maintenance Schedule
This section describes the assemblies to sched
-
ule for maintenance.
• Daily
• Weekly
5
• Six Month Checkups
Lubrication
Requirements
This section describes the lubrication require
-
ments for the machine, including types of lube to
use. This section includes:
• Linear Bearings, Flange Bearing, and Pillow
Blocks
• Gear Motor Lubrication Requirements
• Ball Screws
• Description of Air Input System
• Adjusting the Air Line Lubricator
• Priming the Air Line Lubricator
Maintaining the Chain
Assist
Important Safety Information.
Maintain the
Chain assist
Lubrication Points on
Machine
A graphical look at the grease points on th
machine.
Summary of Contents for ON-3
Page 4: ...KVAL ON 3V Service Manual ...
Page 21: ...Getting Help from KVAL 1 15 KVAL Manual Page Intentionally Left Blank ...
Page 36: ...Description of Air Input System 2 14 KVAL Manual ...
Page 58: ...Index Kval ON 3V ...
Page 59: ......