Lockout Tagout Procedure
1-14
990-APEX Service Manual
b.
Disconnect style Electrical Panels:
push the red tab to pop it out. Place a pad
-
lock through the hole. Place your tag on the padlock, as per the tagout guide
-
lines below. (see illustration below).
Lockout Tagout Air Supply
5.
Turn all air valves to the OFF position and place a padlock through the hole (see
illustration below).
NOTE:
Place your tag on the padlock, as per the tagout guidelines.
Start Maintenance
6.
Once the locks and tags are in place and all personnel are clear, attempt to operate
the machine to ensure equipment will not operate.
7.
Maintenance or repairs may started.
Post Maintenance Steps
8.
After maintenance is completed, the person performing the work must ensure all
tools, spare parts, test equipment, etc., are completely removed and that all guards
and safety devices are installed.
Insert Lock into hole.
Turn Switch to the
OFF
position
Lock and Tag out
Summary of Contents for 990-APEX
Page 10: ...990 APEX Service Manual Table of Contents ...
Page 31: ...Kval Return and Warranty Policy 1 21 990 APEX Service Manual Page Intentionally Left Blank ...
Page 97: ......
Page 98: ...Notes ...
Page 99: ...Notes ...