Instructions for work
Silo unloader - Straw spreader - Mixer - Distributor
ATHENOR 6070
55
Loading the machine
- From the tractor cab or walkway, position the hook so
as to take the product over a depth of about 40 cm.
- Move the hook in a to and fro movement while
lowering the arm gently.
- When the hook is down, take it inside the body while
raising the arm to ensure proper filling.
- Raise the arm with the hook retracted and repeat the
loading operation until the machine is properly filled.
- At the end of loading, set the hook in the position of
rear door without compressing the product against the
bale separator.
Always start unloading the product from the top.
Never compress the product against the bale
separator.
Summary of Contents for ATHENOR 6070
Page 2: ......
Page 19: ...Safety Silo unloader Straw spreader Mixer Distributor ATHENOR 6070 17 ...
Page 94: ...Silo unloader Straw spreader Mixer Distributor 92 ATHENOR 6070 Trouble shooting guide ...
Page 97: ......
Page 98: ......