CAB INSTALLATION
9 of 29
STEP 4: (SIDEFRAMES/REAR LEGS
cont
’
d.)
4.4
Using hardware listed below, bolt the left fender
bracket to the left sideframe/rear leg. Making sure to
fully tighten hardware down. See fig. 4.4. Repeat the
process for the right fender bracket.
Hardware Used
Qty
5/16
-
18 X 3/4 FHCS
2
5/16 Plastic Washer
2
Fig. 4.4 (fender bracket installation
-
left)
Fig. 5.3 (fender bracket onto sideframe tab
-
left)
STEP 5: SIDEFRAMES
For Standard Cab only.
If installing a premium cab, proceed to step 6 on the
next page.
5.1
For ease of handling, temporarily remove the doors
from the sideframes. Make sure to also remove the (4)
hinge washers and set aside for reuse.
5.2
Starting at the floorboard of the left sideframe,
install the
1”
round rubber provided onto the sideframe,
continue up the sheetmetal edge of the sideframe. Cut
the rubber flush with the inside rear flange of the fender
contour. See fig. 5.2.
Note: Use a rubber mallet or plastic dead blow hammer
as needed to secure the rubber onto the sideframe and
rear leg.
5.3
Using hardware listed below, bolt the left fender
bracket to the left sideframe tab. Making sure to fully
tighten hardware down. See fig. 5.3. Repeat the
process for the right fender bracket.
Hardware Used
Qty
5/16
-
18 X 3/4 FHCS
2
5/16 Plastic Washer
2
Fig. 5.2
(1”
round bulb rubber installed
-
left)
start
1”
round bulb
rubber here
cut rubber flush with
back edge of sideframe