12 SERVICE WORK ON THE CHASSIS
71
E00387-10
–
Tighten screw
4
.
Guideline
Screw, top steering
head
M20x1.5
12 Nm (8.9 lbf ft)
E00388-10
–
Mount and tighten screw
8
.
Guideline
Screw, top
steering stem
M8
17 Nm (12.5 lbf ft)
Loctite
®
243™
E00386-11
–
Tighten screws
9
.
Guideline
Screw, top triple
clamp
M8
17 Nm (12.5 lbf ft)
–
Secure the wiring harness with cable holder
bk
.
K00546-11
–
Position the brake caliper, and mount and tighten screws
bl
.
Guideline
Screw, front
brake caliper
M8
25 Nm (18.4 lbf ft)
Loctite
®
243™
–
Mount the cable tie(s).
–
Position the brake line, wiring harness, and clamp. Mount and
tighten screws
bm
.
Finishing work
–
Mount the handlebar cushion.
–
Install front fender. (
–
Install the front wheel.
–
Install the headlight mask with the headlight. (
–
Check that the wiring harness, throttle cables, and brake and
clutch lines can move freely and are routed correctly.
–
Check the play of the steering head bearing. (
–
Remove the motorcycle from the lift stand. (
–
Check the headlight setting. (