7 Servicing/Maintenance
62 of 92
ILN / ILNC / ILNR
5211.8/08-EN
7.5.4.4 Installing the back pull-out unit
ü
The notes and steps stated in (
Section 7.5.4.1, Page 60) to (
Section 7.5.4.3, Page 61) have been observed/
carried out.
ü
Any damaged or worn parts have been replaced by original spare parts.
ü
The sealing surfaces have been cleaned.
1. If required, suspend or support the back pull-out unit to prevent it from tilting.
2. Insert casing wear ring 502.1 into volute casing 102.
3. Insert the back pull-out unit into volute casing 102.
4. Mount drive lantern 341.
5. Tighten nuts 920.3. Observe the tightening torques. (
7.5.4.5 Installing the coupling
ü
The notes and steps stated in (
Section 7.5.4.1, Page 60) to (
Section 7.5.4.4, Page 62) have been
observed/carried out.
1. Fit the pump-end coupling half on pump shaft 210.
2. Fit the drive-end coupling half on the motor shaft.
3. Insert the teeth of the pump-end coupling half into the flexible coupling
elements of the drive-end coupling half .
After the motor has been mounted, (
Section 7.5.4.6, Page 62) the coupling must
7.5.4.6 Mounting the motor
ü
The notes and steps stated in (
Section 7.5.4.5, Page 62) to (
Section 7.5.4.5, Page 62) have been
observed/carried out.
1. Place the motor on drive lantern 341.
2. Tighten hexagon head bolts 901.1.
3. Align the pump and motor. (
7.6 Tightening torques
7.6.1 Tightening torques for ILN/ILNC
Table 17:
Tightening torques for bolts, screws and/or nuts
Thread
Steel
Stainless steel
Tightening torques
[Nm]
M4
3,1
2,15
M5
6,1
4,25
M6
10,4
7,3
M8
25,2
17,7
M10
49,5
34,8
M12
85,2
59,9
M16
211
148
M20
412
290
M24
710
500
M27
1050
750
M30
1420
1000
Summary of Contents for ILN
Page 1: ...In line Pump ILN ILNC ILNR Operating Manual ...
Page 89: ...Index 89 of 92 ILN ILNC ILNR 5211 8 08 EN W Warnings 8 Warranty claims 7 ...
Page 90: ......
Page 91: ......