5 Installation at Site
23 of 64
Hya-Rain/Hya-Rain N
Fig. 8:
Undoing the nuts at the terminal box
4. Remove the terminal box from the system and open it.
Fig. 9:
Removing the terminal box from the system and opening it
5. Feed the power cable of the float switch through the cable gland provided.
Make sure the cable gland is pointing down. Fasten it in this position.
Fig. 10:
Connecting the power cable in the terminal box
6. Tighten the cable gland.
7. Connect the power cable.
8. Close the terminal box.
9. Mount the terminal box on the system.