
V - 2
Standard operation
5.3 Control panel
(1)
Switch for switching and power supply „ON“ and
„OFF“.
(2)
The (green) indicator lamp lights up when (1) is
switched on.
(3)
The (red) indicator lamp lights up when the scraper
floor is switched on.
The lamp goes out when the scraper floor is switched
off automatically, i.e. when the wagon is full.
(4)
Switch for operating the pick-up
(5)
Switch for operating the articulated tow-bar
(6)
Switch for hydraulically operating the rear flap (see
also Page III - 14 – Section 3.9.6)
(7)
The (red) indicator lamp lights up when rear flap is
open to full extent.
(8)
Switch for operating the hydraulic cutters
0 system
(9)
The (red) indicator lamp lights up when the cutter 0
circuit is operated or when the cutter unit is not in its
operating position.
(10) Switch for the floodlamp in the storage area.
(11) Switch for changing cutters.
When changing cutters, first switch cutter
unit to Position „Cutters 0“ using Switch
(8) and arrest it. After this, lower
completely with Switch (11)
simultaneously.
(12) The (green) indicator lamp lights up when the
arrest ram for the steering axle (special fitting) is
pressurised and the steering is therefore locked.
(13) Metal retainer bracket for the switch box
(14) Switch for operating the scraper floor (switches
two speeds with fast speed floor conveyor option)
5XLS0001
5
4
10
11
12
13
3
14
6
9
7
8
1
2
Summary of Contents for Titan 6/50 GL
Page 4: ...Foreword ...
Page 8: ...Contents A1 3 Assembling the superstructure A 7 A2 Electrical circuit diagram A 10 ...
Page 12: ...I 4 General information ...
Page 17: ...II 5 Safety ...
Page 24: ...II 12 Safety ...
Page 41: ...III 17 Operation KDW03210 1 Arrest the short cut loading wagon by applying the parkingbrake 1 ...
Page 42: ...III 18 Operation ...
Page 80: ...IV 38 Comfort Control Unit ...
Page 86: ...VI 4 Hydraulic system 6 2 3 Hydraulic unit standard ...
Page 87: ...VI 5 Hydraulic system 6 2 4 Hydraulic unit operator friendly ...
Page 90: ...VI 8 Hydraulic system ...
Page 110: ...VIII 2 Overwintering ...
Page 112: ...IX 2 Recommissioning ...
Page 114: ...X 2 Faults causes and removal ...
Page 133: ...A 19 Appendix ...