VII - 10
Maintenance
Shortening the scraper-floor chain
•
Remove the cotter pin (1) on the chain joint (3).
•
Remove the locking piece (2)
•
Shorten the chain by 2 or 4 links at a time.
•
Join the chain with the chain joint (3).
•
Secure the locking piece (2) and cotter pin (1).
Both scraper-floor chains must be
shortened by the same amount. In the
case of double scraper floors, the
respective associated pairs of chains must
be shortened.
KLW09030
1
7.9
Scrapers
The scrapers are located on the conveyor
drum at the front of the storage area.
•
Check the backs of the scrapers (1) for wear after
each season and replace if necessary.
7.9.1 Distance knives to drum
KDW04040
1
2
KDW05060
3
2
1
The distance of the knives to the drum is
adjusted at the factory by means of the set
screws (2) and the lock nuts (1). This
factory adjustment must not be changed.
XXL00004
At the end of the season stop plate (1) must be checked
for wear.
If the thickness of the stop plate (t=6mm)
should be reduced by 50%, the plate must
be replaced (PN 334 975-2).
•
Tension spring (3) again until it becomes possible to
install bolt (5).
•
Remove the spindle and the bolt from hole (7).
Summary of Contents for Titan 6/50 GL
Page 4: ...Foreword ...
Page 8: ...Contents A1 3 Assembling the superstructure A 7 A2 Electrical circuit diagram A 10 ...
Page 12: ...I 4 General information ...
Page 17: ...II 5 Safety ...
Page 24: ...II 12 Safety ...
Page 41: ...III 17 Operation KDW03210 1 Arrest the short cut loading wagon by applying the parkingbrake 1 ...
Page 42: ...III 18 Operation ...
Page 80: ...IV 38 Comfort Control Unit ...
Page 86: ...VI 4 Hydraulic system 6 2 3 Hydraulic unit standard ...
Page 87: ...VI 5 Hydraulic system 6 2 4 Hydraulic unit operator friendly ...
Page 90: ...VI 8 Hydraulic system ...
Page 110: ...VIII 2 Overwintering ...
Page 112: ...IX 2 Recommissioning ...
Page 114: ...X 2 Faults causes and removal ...
Page 133: ...A 19 Appendix ...