
Start-up
39
Pos: 94.14 /Ü berschriften/Ü berschriften 2/U-Z/UÜ berpr üfung des Erstanbaues @ 35\mod_1257843599703_78.docx @ 330187 @ 2 @ 1
7.3
Checking the First fitting
Pos: 94.15 /BA/Inbetri ebnahme/EasyCut/Ü ber prüfung des Erstanbaues Achtung EC F 280(M) / F 320(M) / F 360(M) @ 204\mod_1386142598536_78.docx @ 1701547 @ @ 1
CAUTION!
Machine or tractor may be damaged if the machine is connected incorrectly.
If the universal shaft is bent unfavourably, the machine runs irregularly and machine or tractor
may be damaged seriously.
• To prevent damages, the machine must be aligned in parallel to the ground in the raised
condition.
Pos: 94.16 /BA/Inbetri ebnahme/EasyCut/Ü ber prüfung des Erstanbaues Bild EC F 280(M) / F 320(M) / F 360(M) @ 205\mod_1386257293841_78.docx @ 1707146 @ @ 1
EC-460-0
Fig. 16
Pos: 94.17 /BA/Inbetri ebnahme/EasyCut/Ü ber prüfung des Erstanbaues Beschrei bung EC F 280(M) / F 320(M) / F 360(M) @ 205\mod_1386319363029_78.docx @ 1707967 @ @ 1
Mount top link on the A-frame (Weiste triangle) or on the upper coupling point of the machine so
that the machine is aligned as parallel as possible to the ground in the raised condition.
To do this:
• Raise the machine.
• Switch off tractor, secure the tractor from rolling away and remove the ignition key.
• Check the parallelism of the machine to the ground.
If the parallelism is OK, connecting can be continued.
If the parallelism deviates too strong:
• Lower machine to the ground.
• Switch off tractor, secure the tractor from rolling away and remove the ignition key.
• Move top link in the hole pattern on the A-frame (Weiste triangle).
• Raise the machine and check parallelism.
Repeat this process until the machine raises in parallel to the ground.
Pos: 94.18 /Layout Module /---------------Seitenumbr uch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Summary of Contents for EasyCut F 280
Page 95: ......