
Commissioning
34
Pos: 92.13 /BA/Erstinbetriebnahme/EasyC ut/Anbau Weiste-Drei eck @ 3\mod_1204640890345_78.docx @ 71160 @ 2 @ 1
6.4
Installation of Weiste triangle
1
Fig. 10
Pos: 92.14 /BA/Sicherheit/7. Gefahr enhinweise alt/M ähwer ke/War nung Anbau des Kuppel drei ecks (Weiste Dr eieck) @ 3\mod_1204638378407_78.docx @ 71102 @ @ 1
Warning - Installation of the triangle linkage (Weiste triangle)
Effect: Danger to life or serious injuries. Considerable damage to the machine
Observe manufacturer's operating instructions for the triangle linkage!
Pos: 92.15 /BA/Erstinbetriebnahme/EasyC ut/Anbau Weiste-Drei eck Text @ 3\mod_1204638631735_78.docx @ 71179 @ @ 1
For the installation of the front-mounted disc mower, a Weiste triangle (1) is attached to the front
hydraulics. Adjust the top suspension arm in such a way that the triangle is inclined slightly
forward.
Pos: 92.16 /Ü berschriften/Ü berschriften 2/U-Z/VVor ber eitung am Frontscheibenmäher @ 35\mod_1257497246000_78.docx @ 329285 @ 2 @ 1
6.5
Preparation on the front-mounted disc mower
Pos: 92.17 /BA/Erstinbetriebnahme/EasyC ut/Vor bereitung am Fr ontschei benmäher EC 28/32 28P/32P 28M @ 10\mod_1221659810103_78.docx @ 136162 @ @ 1
Fig. 11:
• Push the PTO shaft (3) with full protection (4) onto the PTO shaft end of the machine.
• The safety mechanism must engage
• Secure the PTO shaft guard (2) against turning with pipe clamp (2).
Pos: 92.18 /Layout Module /---------------Seitenumbr uch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Summary of Contents for EasyCut F 280
Page 95: ......