4
ELECTRICAL CONNECTIONS
20
SMARTPAT COND 1200
www.krohne.com
09/2015 - 4003041501 - MA SMARTPAT COND1200 R01 en
•
This installation is only recommended if the pipeline is completely filled and if there are no
particles or air bubbles in the pipeline.
•
This installation is only recommended if the pipeline is completely filled and if there are no
particles or air bubbles in the pipeline.
•
Consider the diameter of the pipeline, i.e. compare pipeline DN with insertion length of the
sensor shaft.
Figure 4-5: Installation for clean water
1
Flow direction
2
Ordered sensor
Figure 4-6: Possible installation
1
Flow direction
2
Ordered sensor
MA_SMARTPAT_COND_1200_en_150902_4003041501_R01.book Page 20 Monday, September 21, 2015 4:33 PM