OPERATION
5
11
DK32 DK34
www.krohne.com
04/2015 - 4000422303 AD DK32/34 II2G R03 en
5.1 Start-up
Start-up is only permitted when the variable area flowmeter:
•
is correctly installed in the system and connected.
•
has been checked for the proper state with regard to its installation and connection
requirements.
The user of the system must have it checked before start-up in compliance with the national
regulations for checks before startup.
5.2 Operation
Setting of the limit switches may be carried out during operation. Remove the housing cover to
this purpose. The housing cover has to be closed immediately after the limit switches have been
set.