Horizontal Heat Shield Installation
SECTION 7
VENTING
#CLW-50-MV
R.1 October 2021
46
HUSSONG MFG. CO., INC.
KOZY HEAT FIREPLACES
7.4 Horizontal Heat Shield Installation
IMPORTANT: The horizontal vent heat shield must be installed when
using a horizontal 45° elbow off the back of the appliance.
1. Bend perforation on the (1) hand-tab down on the horizontal
vent heat shield.
2. Locate the (2) screw holes located above the flue outlet on the
back of the fireplace.
3. Align the (2) slots on the heat shield with the corresponding
(2) screw holes on the back of the fireplace. Secure with the
attachment screws (provided). The 1” (25mm) vent stand-off tab
will rest on top of the vent pipe.
7.5 #800-WPT & #800-WPT2
Installation Instructions
Refer to section
and
on page 16 for #800-WPT &
#800-WPT2 rough-in framing dimensions.
1. Measure wall thickness. Cut the included insulation to this
length.
2. Install wall pass-through section marked #1 (with 3/8” [10mm]
flange) into framed opening. Secure to interior wall with screws
(not provided). See
3. From the exterior, place insulation between flange and the top of
the framed opening in the wall pass-through section #1, cutting
as needed.
4. Install section marked #2 of wall pass-through into framed
opening, overlapping metal sections as necessary to
accommodate wall thickness. Secure to exterior wall with screws
(not provided).
5. Follow vent manufacturer installation instructions for vent
installation.
Attachment Screws
Vent Stand-off Tab
3/8” (10mm) flange must
be on interior wall
Insulation
FIGURE 7.2
Installed Heat Shield Assembly
FIGURE 7.3
#800-WPT & #800-WPT2 Installation