Nailing Flange Assembly and Installation
SECTION 3
FRAMING
#CLW-50-MV
R.1 October 2021
12
HUSSONG MFG. CO., INC.
KOZY HEAT FIREPLACES
3.2 Nailing Flange
Assembly and Installation
CAUTION: Never permanently remove these assemblies from the
fireplace—they must be secured regardless of finish material used.
Refer to
below for nailing flange installation.
1. Remove (2) nailing flanges from the right and left side of the
fireplace.
2. Align nailing flange with holes on outside corners of fireplace,
with the stand-off flanges on the nailing flanges facing away
from the fireplace.
3. Secure the nailing flanges to the fireplace with screws (provided)
through the slots in nailing flanges.
4. Bend perforation on nailing flange until parallel with fireplace
face. Do not bend toward fireplace face.
5. UNTIL ALL FRAMING REQUIREMENTS ARE COMPLETED:
Position framing stud against the small stand-off (located on
backside of nailing flange). Secure with nails or screws.
•
When installed, the nailing flanges provide the minimum
2½“ (64mm) clearance from the sides of the fireplace
to framing.
Stand-off flange
Nailing flange installed
Nailing flange as
shipped
Nailing flange
installed
Framing stud
2½”
(64mm)
Clearance
Nailing flange
Stand-off flange
Nailing flange
Framing stud
BACK VIEW
FRONT VIEW
TOP VIEW
FRONT VIEW
FIGURE 3.2
Nailing Flange Installation
ALL DESIGN OPTIONS INSTALLATION