79
3.
)
In apple and android app stores, enter the KOYOE-log keyword, and users can
download apps to your mobile device. After installation and registering an
account,The method is shown in Fig11-5.
Figure 11-5
4
)
Enter the user name and password to log in, and the user can monitor the voltage,
current and power of the inverter. (GPRS module only needs to fill in the SN
code in Figure 11-4, and then click Register to monitor the data without the
previous steps)
12. Maintenance and Repair
12.1. Precautions during Maintenance
When the inverter fails, the inverter will automatically disconnect from the grid and send fault
or warning information. For solutions to simple faults, please refer to the common in
Appendix I.
12.2 .Safety Requirements during Maintenance
For the operation running and after operation, the shell temperature
is high due to the heat generated by power circuit, which is at risk of
scalding. Contact operation shall be carried out after cooling.
Summary of Contents for KY-EST06KH
Page 1: ...1 User Manual 3 Phase Hybrid Inverter KY EST06KH KY EST20KH V1 0...
Page 10: ...10 Dimensions KY EST06 10KH unit mm Dimensions KY EST12 20KH unit mm...
Page 12: ...12 Fig1 5 Three phase Meter Dimension unit mm...
Page 15: ...15 Each successive press of the button selects a new parameter...
Page 16: ...16 Each successive press of the button selects a new parameter...
Page 17: ...17 Each successive press of the button selects a new parameter...
Page 32: ...32 View the power quality response mode...
Page 34: ...34 Figure 5 2 2...
Page 68: ...68...
Page 70: ...70 Figure...