31
Figure 5-2
Once power quality and grid Settings are selected during debugging, they should be locked,
non-editable (unless password is used), and used only for viewing. Passwords are not
always available. You are advised to obtain passwords from the manufacturer and the
importer or exporter as required for independent maintenance
You can perform the following steps to view the configured country code/firmware version
and power quality response mode. (Do not need access permission to view)
Please refer to the following steps:
Step 1: Press "OK" on the main interface to enter the next interface, then display
"Information" under the "Menu" Menu, and then press "OK" to enter the next Menu.
Step 2: Enter the menu of "Running Data" and click "Up" and "Down" to view the firmware
version/country code and power quality response mode after setting.
Summary of Contents for KY-EST06KH
Page 1: ...1 User Manual 3 Phase Hybrid Inverter KY EST06KH KY EST20KH V1 0...
Page 10: ...10 Dimensions KY EST06 10KH unit mm Dimensions KY EST12 20KH unit mm...
Page 12: ...12 Fig1 5 Three phase Meter Dimension unit mm...
Page 15: ...15 Each successive press of the button selects a new parameter...
Page 16: ...16 Each successive press of the button selects a new parameter...
Page 17: ...17 Each successive press of the button selects a new parameter...
Page 32: ...32 View the power quality response mode...
Page 34: ...34 Figure 5 2 2...
Page 68: ...68...
Page 70: ...70 Figure...