77
Electrical connection - Standard circuit
E.g. Lamp control
Strip connecting cables to approx. 6–8 mm and connect
as follows:
• Refer to the connection diagram
• Phase L to terminal L
• Neutral wire N to terminal N
• Do
not
remove wire bridge between L and D1
• Switch wire to the consumer to terminal D2
The motion switch is ready for operation approximately
90 seconds (calibration time/warm-up time) after connec-
tion to the power supply system.
Ground connection (gnge) to terminal „
“
Motion Switch
Load/
Consumer
L
N
D2
D1
Wire Bridge
L
N
GB
Summary of Contents for INFRAcontrol R 240
Page 9: ...9 D 4 3 5 ...
Page 31: ...31 4 3 5 NL ...
Page 53: ...53 4 3 5 F ...
Page 75: ...75 4 3 5 GB ...
Page 97: ...97 4 3 5 S ...
Page 112: ...Heinrich Kopp GmbH Alzenauer Str 68 63796 Kahl a Main DEUTSCHLAND www kopp eu DU17100252 ...