![Kongskilde VIBRO TILL 2900 Series Assembly Manual Download Page 19](http://html1.mh-extra.com/html/kongskilde/vibro-till-2900-series/vibro-till-2900-series_assembly-manual_1992824019.webp)
19
To complete the assembly of the self levelling wheel link system, install the front pivot link to the lug
in the centre of the front frame. Attach the wide end of the large triangular self levelling link to the
main pivot with the long pin provided and attach the narrow end to the front pivot link with the shorter
pin provided. These parts are the same for both the 10' and 13' centres and are installed in the same
manner.
Check the assembly of the self levelling linkages and make sure all of the locking pins are installed
and locked.
Self levelling link
Front hitch
pivot link
Detail view of front linkages on
10' (3m) centre
Overview of completed 10' (3m)
self levelling linkage system.
Summary of Contents for VIBRO TILL 2900 Series
Page 44: ...44 660 005 033 February 2016...