1.
Set the work equipment on the level and firm ground in the
maintenance posture as shown in the figure, then lower it
to the ground and stop the engine.
2.
By using a grease pump, pump in grease through the grease fittings shown by arrows.
(1) Boom cylinder rod pin (2 places)
(2) Arm cylinder foot pin (1 place)
(3) Boom and arm connection pin (1 place)
(4) Arm cylinder rod end (1 place)
(5) Bucket cylinder foot pin (1 place)
(6) Boom cylinder foot pin (2 places)
(7) Boom foot pin (2 places)
3.
After greasing, wipe off any old grease that is pushed out.
MAINTENANCE
MAINTENANCE PROCEDURE
4-47
Summary of Contents for PC360LC-11
Page 2: ......
Page 22: ......
Page 76: ......
Page 344: ......
Page 425: ...SPECIFICATIONS 5 1 ...
Page 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 430: ......
Page 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Page 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Page 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Page 499: ...REPLACEMENT PARTS 7 1 ...
Page 515: ......