![Komatsu PC360LC-11 Operation & Maintenance Manual Download Page 335](http://html1.mh-extra.com/html/komatsu/pc360lc-11/pc360lc-11_operation-and-maintenance-manual_1991259335.webp)
PRECAUTIONS FOR USING LIGHTWEIGHT TOWING HOLE
k
k
WARNING
• Always use the correct towing equipment and towing method. Any mistake in the selection of the
wire rope or drawbar or the method of towing a disabled machine and being towed may lead to seri-
ous personal injury or death. Select the appropriate tools and methods.
• The shackle must always be used.
• Hold the wire rope level and set it straight to the track frame.
• Move the machine slowly and be careful not to apply any sudden load to the wire rope.
• Do not use the tie-down holes for towing the machine.
There is a hole in the track frame to fit the shackle when towing
light objects.
Permissible towing load: Max. 108000 N {11000 kg}
PRECAUTIONS FOR SEVERE JOB CONDITION
• When performing digging operations in water, if the work equipment mounting pin goes into the water, per-
form greasing every time the operation is performed.
• For heavy-duty operations and deep digging, perform greasing of the work equipment mounting pins every
time before operation.
After greasing, operate the boom, arm and bucket several times, then grease again.
OPERATION
TROUBLES AND ACTIONS
3-259
Summary of Contents for PC360LC-11
Page 2: ......
Page 22: ......
Page 76: ......
Page 344: ......
Page 425: ...SPECIFICATIONS 5 1 ...
Page 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 430: ......
Page 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Page 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Page 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Page 499: ...REPLACEMENT PARTS 7 1 ...
Page 515: ......