MAINTENANCE PLAN
142
4.7.5 MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION
(Only for machines in which the synthetic biodegradable oil type
HEES is used)
(Operations to be carried out together with those prescribed at
point“4.7.6 MAINTENANCE EVERY 50 HOURS OF OPERATION”)
4.7.6 MAINTENANCE EVERY 50 HOURS OF OPERATION
4.7.7 MAINTENANCE EVERY 100 HOURS OF OPERATION
4.7.8 MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION
(Operations to be carried out together with those prescribed at point “4.7.9
MAINTENANCE EVERY 250 HOURS OF OPERATION”)
N.
PART
OPERATION
PAGE
a
Hydraulic oil drain filter
(Only for machines with synthetic biodegrada-
ble oil)
Change
168
N.
PART
OPERATION
PAGE
a
Radiator
Check level
161
b
Swing joint
Lubricate (1 point)
162
c
Electrical system
Check
162
N.
PART
OPERATION
PAGE
a
Ball-bearing ring
Lubricate (4 points)
163
N.
PART
OPERATION
PAGE
a
Travel reduction gears
Change oil
179
b
Swing reduction gear
Change oil
180
c
Hydraulic oil drain filter
Change cartridge
168
d
Engine valves
Check clearance
178
Summary of Contents for PC110R-1
Page 2: ......
Page 19: ...17 SAFETY AND ACCIDENT PREVENTION...
Page 51: ...49 THE MACHINE AND ITS OPERATIONS...
Page 126: ...124 PAGE INTENTIONALLY LEFT BLANK...
Page 127: ...125 MAINTENANCE...
Page 190: ...188 PAGE INTENTIONALLY LEFT BLANK...
Page 191: ...189 TECHNICAL SPECIFICATIONS...
Page 198: ...196 PAGE INTENTIONALLY LEFT BLANK...
Page 199: ...197 AUTHORISED OPTIONAL EQUIPMENT...