2.
Remove the bolts (3), and remove the handrail (B) and
cover (4).
3.
Remove the bolts (5), and remove the handrail (C).
METHOD FOR INSTALLING HANDRAIL
Install the handrails (C), (B), and (A) in this order.
1.
Install the handrail (C), then tighten it with bolts (5).
2.
Install the handrail (B) and cover (4), then tighten them with bolts (3).
3.
Install the handrail (A) and cover (2), then tighten them with bolts (1).
Tightening torque: 98 to 123 Nm{10.0 to 12.5 kgm}
METHOD FOR REMOVING AND INSTALLING CLIMBING HANDLE
When removing and installing handle (A) for transportation of
the machine, etc., perform the operation according to the fol-
lowing procedure.
METHOD FOR REMOVING CLIMBING HANDLE
Remove bolt (1) and remove handle (A).
METHOD FOR INSTALLING CLIMBING HANDLE
Install handle (A) and tighten it with bolts (1).
METHOD FOR REMOVING AND INSTALLING REVOLVING LAMP
METHOD FOR REMOVING REVOLVING LAMP
Remove the revolving lamp according to the following procedure.
TRANSPORTATION
OPERATION
3-250
Summary of Contents for HB365LC-3
Page 2: ......
Page 25: ...LOCATION OF SAFETY LABELS 5 SAFETY SAFETY LABELS 2 5...
Page 348: ......
Page 436: ......
Page 437: ...SPECIFICATIONS 5 1...
Page 441: ...HB365LC 3 SPECIFICATIONS SPECIFICATIONS 5 5...
Page 442: ...HB365NLC 3 SPECIFICATIONS SPECIFICATIONS 5 6...
Page 489: ...REPLACEMENT PARTS 7 1...
Page 505: ......