1. Unload valve
FUNCTION
1) When the control valve is at HOLD, pump discharge amount
Q
discharged bythe minimum swash plate angle is
released to the tank circuit. When this happens, pump discharge pressure
P
P
is set to 16 bar (16 kg/cm
2
) by
spring (2) inside the valve.
(
LS
pressure
P
LS
=0 bar (0 kg/cm
2
)
OPERATION
When control valve is at HOLD
.
At the left end of spool (1), pump pressure
P
P
is act-
ing on area
S1
, and at the right end of spool (1),
pump pressure
P
P
is acting on area
S2
, and
LS
pressure
P
LS
is acting on area
S3
.
.
When the control valve is at HOLD,
LS
pressure
P
LS
is not generated, so onlypump discharge
P
P
has anyeffect, and
P
P
is set bythe load of spring
(2).
.
As pump discharge pressure
P
P
rises and reaches
the
P
P
x
S1
=
P
P
x
S2
+spring force of spring (2),
spool (1) is moved to the right.
Pump circuit
P
P
is then connected to tank circuit
T
through the drill hole.
.
In this way, pump discharge pressure
P
P
is set to
16 bar (16 kg/cm
2
).
P
P
=Pump circuit
P
LS
=LS circuit
T
=Tank circuit
A
=To valves
B
=To pump
LS
valve
10-56
PC20R-8 PC27R-8
RKP00720
1
P
P
B
S
3
S
2
T
T
A
S
1
2
P
LS
Summary of Contents for F30791
Page 1: ......
Page 2: ...40 28 PC15R 8...
Page 4: ...00 2 PC20R 8 PC27R 8...
Page 17: ...GRUPPO 10...
Page 18: ...40 28 PC15R 8...
Page 32: ...10 14 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 34: ...10 16 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...10 18 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 61: ...10 43 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 86: ...10 68 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 94: ...10 76 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 98: ...10 80 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 108: ...10 90 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 110: ...10 92 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 112: ...10 94 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 114: ...10 96 PC20R 8 PC27R 8...
Page 115: ...GRUPPO 20...
Page 116: ...40 28 PC15R 8...
Page 180: ...H 20 64 TESTING AND ADJUSTMENTS PC20R 8 PC27R 8...
Page 181: ...GRUPPO 30...
Page 182: ...40 28 PC15R 8...
Page 262: ...30 80 REMOVAL AND INSTALLATION PC20R 8 PC27R 8...
Page 263: ...GRUPPO 40...
Page 264: ...40 28 PC15R 8...
Page 287: ...40 23 PC20R 8 PC27R 8 PAGE INTENTIONALLY LEFT BLANK...
Page 298: ...40 34 PC20R 8 PC27R 8...